Skip to content
Monday – Friday: 6 a.m. – 4:30 p.m.Registered business entity · OK Filing # 000000VerifyLead-Safe Certified Firm (RRP) · US Firm # 000000VerifyGeneral liability insuranceWorkers' compensation coverage
3 more licenses
  • Registered business entity · OK Filing # 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Firm # 000000Verify
  • General liability insurance
  • Workers' compensation coverage
Shutdown desk(918) 555-0102
Red steel roof trusses and bracing over a corrugated ceiling, seen from the floor

Industrial coatings, Tulsa, Oklahoma

Steel coated inside your shutdown window.

Red Fork Industrial Coatings blasts, primes and coats structural steel, tanks, piping and plant floors for Oklahoma facilities. A forty-person crew, a written safety plan before mobilization, and a handback binder at the end.

Safety record

The figures a prequalification form asks for

Every contractor-safety portal wants the same few numbers. Ours are here, with the letters and logs behind them in the safety file.

  • 0.82

    Experience modification rate

    Current policy year

  • 1.1

    Total recordable incident rate

    Three-year average

  • 0

    Lost-time cases

    Last full year

  • Every shift

    Toolbox talk and sign-in

    Before anyone climbs or sprays

Sample figures.

Shutdown windows

Book the window before it opens

Most outages in our area cluster in spring and fall. Coatings have limits of their own: surface temperature, dew point and wind. This is the year from the crew's side.

  • Spring outage season

    Refinery, terminal and plant turnarounds. Walk-downs happen the fall before, so crew and abrasive are held for you.

    Mar to May

  • Fall outage season

    The second run of turnarounds, and the last good stretch for exterior steel before the cold.

    Sep to Nov

  • Summer: nights and shade

    Steel in July sun is too hot to coat. We move to night shifts, work the shaded faces and read surface temperature on a gauge.

    Jun to Aug

  • Winter: heat and enclosures

    Below the product's limits we heat an enclosure or move to interior steel, floors and containment.

    Dec to Feb

  • Weekend and short outages

    A line down for two days still gets a written plan. Tell us the hours and we'll tell you what fits.

    all year

What we coat

Three kinds of work, one crew

Prep and coating stay with the same people, so the crew that blasts the steel is the crew that primes it.

  • Orange-painted steel column and beams beneath a white ceiling in a warehouse

    Structural steel

    Columns, beams, trusses and bridge girders, from surface prep to finish coat.

    Steel and bridges
  • Weathered steel pipe rack and framework against the sky

    Tanks and piping

    Tank shells and roofs, pipe racks, supports and skids, with interiors scoped to the lining spec.

    Tanks and piping
  • Concrete parking structure with yellow and black striped columns and a gray floor

    Plant interiors

    Columns, walls, ceilings and floor striping in warehouses, garages and process buildings.

    Plant interiors

How a window runs

From walk-down to handback

Five steps, the same on a tank and on a plant-wide turnaround.

  1. 01
    Weeks before

    Step 1: Walk-down

    We stand on the steel with your maintenance lead: access, coating condition, hot work rules and where the lift can go. Old coatings are sampled before we disturb them.

  2. 02
    Before mobilization

    Step 2: Written scope and schedule

    A plan sized to your window: prep grade, the coating system from your spec, shifts, crew size and hold points your inspector can attend.

  3. 03
    Day zero

    Step 3: Orientation and permits

    The crew badges in, sits through your orientation and signs your permits. The rescue plan is posted at the access point.

  4. 04
    Every shift

    Step 4: Work the window

    Containment, prep, prime and coats inside the recoat times, with film readings logged every shift.

  5. 05
    Last shift

    Step 5: Handback

    We walk the punch list with you, clear the abrasive and hand over the daily logs, readings and data sheets in one binder.

Credentials

On file before the first shift

What a facility asks a contractor for, in one place.

  • Registration

    • Registered business entityVerify

      OK Filing # 000000 · Oklahoma Secretary of State

      The firm is registered to do business in Oklahoma. The state doesn't issue a painting-contractor license.

    • Lead-Safe Certified Firm (RRP)Verify

      US Firm # 000000 · U.S. EPA

      The federal rule for paid work that disturbs paint in homes and child-occupied buildings built before 1978.

  • Insurance

    • General liability insurance

      Your facility is named as certificate holder before we mobilize.

    • Workers' compensation coverage

      Covers the crew on your site. The certificate comes with the safety file.

Who runs your job

Five people you can call by name

Each one answers for a part of the work, from the scope to the last film reading.

  • Bernadine Givens

    President

    Signs every scope and every handback. Calls the plant manager herself when a window changes.

  • Hemant Mehrotra

    Estimator and project manager

    Walks the steel, writes the scope and schedule, and keeps the crew count honest to the window.

  • Rosaura Nieto

    Safety director

    Writes the site plan, runs orientation and has stop-work authority on every job.

  • Ardell Youngbird

    Field superintendent

    On the steel every shift, with the crew leads, the lift and the weather.

  • Obinna Nwosu

    Quality control

    Film readings, hold points and the daily log that goes in your binder.

From the maintenance office

“The plan came before I asked for it: scope, shifts, who was on the crew. The tank shell came back with the readings in a binder.”

Gus P.Maintenance planner, bulk terminal

“They worked around our wash-down schedule and never left abrasive in the process area.”

Wilbur T.Plant engineer, food plant

“Orientation took twenty minutes, and every person on the steel had done it.”

Ansel R.Maintenance supervisor, water plant

Sample reviews.

Where the crew goes

Tulsa and the plants around it

Type a ZIP to see whether a crew can reach your site.

Red steel truss bridge seen from the deck, with the trusses repeating into the distance
  • Tulsa County: Tulsa, Sperry · Plants, warehouses and yards along the river corridor
  • Rogers County: Catoosa, Claremore, Verdigris, Inola, Oologah · Port-area terminals and the Claremore plants
  • Osage County: Skiatook, Hominy · Yards and pipeline stations
  • Wagoner County: Wagoner, Porter · Plants and distribution buildings
  • Creek County: Bristow, Kellyville, Mannford, Drumright · Pipeline and processing yards
  • Mayes County: Pryor, Chouteau · The industrial park at Pryor
  • Payne County: Cushing · Tank farms

We don't take jobs more than about two hours' drive from Tulsa without pricing travel and lodging into the scope, and we don't enter a confined space without your permit system and rescue plan.

Questions facility managers ask

How much notice do you need for a shutdown?

For a plant-wide turnaround, eight weeks ahead is a comfortable start, because crew and abrasive are booked against the window. For one tank or one bay, two or three weeks can work. Call with the dates and we'll tell you what fits.

What do you need from us before mobilization?

Your orientation schedule, the permits for the work (hot work, confined space, lockout), a laydown area, power and water, and a named contact on each shift. We send a checklist with the written scope.

What about old coatings that may contain lead?

Older coatings on steel can contain lead, chromium and other metals. We sample before we disturb anything. The result decides containment, air monitoring and waste handling, and all three are written into the scope.

Do you paint buildings built before 1978?

Most of our work is industrial and commercial. Where paid work disturbs paint in a home or a child-occupied building such as a school or daycare built before 1978, a federal rule applies. The firm's EPA certification number is listed under Credentials; ask for it before any work starts.

What happens when weather closes the window?

Wind, rain and a surface close to the dew point stop spraying. The schedule carries weather days, and we tell you the same day what slipped and what we'll do about it.

How do I get a price?

We price from the scope: area or tonnage, prep grade, coat count, access, shifts and the hours in your window. A walk-down comes first, and the written price follows it.

Start here

Send us the scope

Two short steps. We reply with a walk-down date, or ask for drawings first.

Hours
Monday – FridayToday
6 a.m. – 4:30 p.m.

Outage shifts run days or nights, as scoped.

Shutdown desk, while a crew is on your site(918) 555-0102

The job

What needs coating
Your window

How to reach you

The office answers on workdays. While a crew is on your site, call the shutdown desk.