What we log
What goes in a job record
Every job leaves the same binder, so a finished project can be read the way it was run.
Scope and spec
What was coated, to which grade and system.
Daily film readings
Wet and dry film, by shift and by area.
Weather and surface
Surface temperature, dew point and wind at each start.
Handback punch list
What was found, fixed and signed off.
Have a steel job in mind?
Send the drawings or a few photos, and we'll set up the walk-down.


