Structural steel, from bare metal to finish coat

Columns, beams, trusses, deck and bridge girders in plants, warehouses and on crossings.

Steel lasts as long as its prep. We clean to the grade your spec names, prime before flash rust forms and build the film coat by coat, with readings between each. Where the building stays in use, containment and ground cover keep abrasive and overspray inside the work zone.

What a steel job includes

  • Abrasive blast or power-tool clean to the spec's grade

  • Prime the same shift the steel is cleaned

  • Intermediate and finish coats inside the recoat window

  • Film readings logged at every coat

Orange-coated steel girder with rows of rivets, seen from below among braced beams

Choosing the prep

Blast, power tool or hand tool

The spec usually decides, and the building decides what's possible. This is how the three differ on a plant floor.

Blast, power tool or hand tool
What changesPower-tool cleanHand toolAbrasive blast
Surface profilePower-tool cleanCleaner surface, little profileHand toolLoose rust and scale onlyAbrasive blastAnchor profile the coating bonds to
Dust and containmentPower-tool cleanShrouded tools, lighter containmentHand toolGround cover onlyAbrasive blastFull containment and dust collection
Speed on large steelPower-tool cleanSlower, steadyHand toolSlowestAbrasive blastFastest per square foot
Where it fitsPower-tool cleanTight spots, running plants, spot repairHand toolTouch-up and small areasAbrasive blastOpen steel with room for containment

Bridges and crossings

Girders and trusses over traffic and water

Work under a deck or on a truss follows rules a plant doesn't.

Containment has to catch everything below the deck, access has to clear the roadway or the channel, and the hours often come from the owner's traffic or river schedule. We plan the rigging, the containment and the closures with the owner before the scope is written.

Planned first

  • Containment under the deck

  • Rigging and access planned with the owner

  • Closure and traffic hours in the schedule

Blue steel bridge girders and columns seen from underneath, receding to a vanishing point

Questions about steel work

Who picks the coating system?

You or your engineer, from the spec. We follow the manufacturer's data sheet for temperature limits and recoat times. If there is no spec, we propose a system in writing and you approve it.

What about old coatings that may contain lead?

Older coatings on steel can contain lead, chromium and other metals. We sample before we disturb anything. The result decides containment, air monitoring and waste handling, and all three are written into the scope.

How is the work checked?

Dry-film thickness readings are logged each shift, with wet-film checks while spraying, and the log goes in the handback binder. Your inspector can attend any hold point we mark in the schedule.

How do you keep abrasive and overspray where they belong?

Containment, ground cover and a wind limit set in the plan. Spent abrasive is swept and bagged at the end of each shift, and the area is walked with you at handback.

What does the warranty cover?

Workmanship on the coating system we applied, to the written terms. Terms, limits and exclusions are in your written warranty, and how long a coating lasts also depends on the surface, the system and service conditions.

Send the drawings, or the date you can walk it.

A scope and schedule follow the walk-down.