Shutdown windows

What sets the size of the crew

No two windows are alike. Four things decide how many people we send and for how many shifts.

  • Hours in the window

    A forty-hour weekend and a three-week turnaround need different crews.

    • Start and end, to the hour

    • Whether days, nights or both

  • Steel area and prep grade

    Square feet or tons, and the cleaning grade the spec asks for.

    • Drawings or a measured walk-down

    • Existing coating, sampled

  • Access

    Lifts, scaffold, rope access and the lanes to reach them.

    • Where equipment can stand

    • Permits and lockout steps

  • Weather exposure

    Open steel loses days to wind and cold. Enclosed steel doesn't.

    • Spray limits for wind and surface temperature

    • Weather days in the schedule

Shifts

Day crew or night crew

Both work. Which fits depends on your site and the season.

Night shift

  • Heat

    Cooler steel; often the summer choice

  • Light

    Portable lighting and a night supervisor

  • Your staff

    A named contact on call

  • Neighbors

    Quieter roads and yards

Day shift

  • Heat

    Steel can run too hot to coat in summer

  • Light

    Daylight

  • Your staff

    Your maintenance team is on site to answer

  • Neighbors

    Shared traffic with the plant

Weather rules

When the coating says stop

Coatings have limits printed on the data sheet. We read them before the shift, not after the run.

  • Surface temperature

    Too hot and the film dries wrong. Too cold and it won't cure. We check with a gauge at the start of each shift.

  • Dew point

    The steel has to stay a few degrees above the dew point while we spray and while the coat cures.

  • Wind

    A gusty day throws overspray off the steel. The plan sets a wind limit and we hold to it.

Tell us the window.

Dates, hours and the steel. We'll say what fits and what it takes.