Questions facility managers ask
Short answers. The scope has the details.
How much notice do you need for a shutdown?
For a plant-wide turnaround, eight weeks ahead is a comfortable start, because crew and abrasive are booked against the window. For one tank or one bay, two or three weeks can work. Call with the dates and we'll tell you what fits.
Do you work nights and weekends?
Yes. Shifts are scoped with your window, days or nights. Night work adds lighting and a night supervisor on site, and the plan says who.
What do you need from us before mobilization?
Your orientation schedule, the permits for the work (hot work, confined space, lockout), a laydown area, power and water, and a named contact on each shift. We send a checklist with the written scope.
Who picks the coating system?
You or your engineer, from the spec. We follow the manufacturer's data sheet for temperature limits and recoat times. If there is no spec, we propose a system in writing and you approve it.
What about old coatings that may contain lead?
Older coatings on steel can contain lead, chromium and other metals. We sample before we disturb anything. The result decides containment, air monitoring and waste handling, and all three are written into the scope.
Do you paint buildings built before 1978?
Most of our work is industrial and commercial. Where paid work disturbs paint in a home or a child-occupied building such as a school or daycare built before 1978, a federal rule applies. The firm's EPA certification number is listed under Credentials; ask for it before any work starts.
Can you coat while the plant runs?
Often, outside the work zone. We set exclusion zones, ground cover and wind limits with your operations lead before the first shift, and we stop when conditions change.
Who is named on your insurance?
Your facility, as certificate holder, on the certificate we send before mobilization. Cover types and limits are in the safety file, and your risk manager can call our agent.
Do you work through contractor-safety portals?
Yes. We complete your portal's questionnaire and upload the same documents the safety file holds. If your site has its own forms, send them with the scope request.
How is the work checked?
Dry-film thickness readings are logged each shift, with wet-film checks while spraying, and the log goes in the handback binder. Your inspector can attend any hold point we mark in the schedule.
What happens when weather closes the window?
Wind, rain and a surface close to the dew point stop spraying. The schedule carries weather days, and we tell you the same day what slipped and what we'll do about it.
What does the warranty cover?
Workmanship on the coating system we applied, to the written terms. Terms, limits and exclusions are in your written warranty, and how long a coating lasts also depends on the surface, the system and service conditions.
How do I get a price?
We price from the scope: area or tonnage, prep grade, coat count, access, shifts and the hours in your window. A walk-down comes first, and the written price follows it.
How do you keep abrasive and overspray where they belong?
Containment, ground cover and a wind limit set in the plan. Spent abrasive is swept and bagged at the end of each shift, and the area is walked with you at handback.